Intel® Enpirion® Power Solutions
Interact with Intel® product support specialists on Intel® Enpirion® DC-DC Step-Down Power Converters
Announcements
This forum offers only peer-to-peer support. Thank you!
223 Discussions

When using a Cyclone 10 LP device and a Blaster for configuration and testing do you connect the VCC supply of the download cable and TMS, TDI pull ups straight to VCCA or to the 2.5V supply the other side of the recommended filter?

AJone5
Beginner
903 Views
 
0 Kudos
1 Reply
AnandRaj_S_Intel
Employee
431 Views

Hi,

 

Target supply voltage (pin-4)of USB blaster, TMS & TDI Should be connected to VCCA through recommended components.

 

Regards

Anand

0 Kudos
Reply